Below are the details of our Civil Engineering work that’s been undertaken for ICRC, ADRA, UNICEF, UNDP, Pharmacy Sans Frontier, UNISOM, FINCO, WFP, CARE, DynCorp, AMISOM, Bancroft Global & other locally owned companies.

S. No. Project Name Year Client Duration
1 Sugarcane farm irrigation project in Gidiar 1987 Food and Agriculture Organization, Somalia 2 years
2 Rehabilitation of asphalt roads in Forlini Hospital 1989 JV FINNCO, Somalia 1 year
3 Shipments from Mombasa – El Maan port 50 TON food 1991-93 International Committee of the Red Cross, Somalia 2 years
4 Inland transport of 50-ton Food 1991-93 International Committee of the Red Cross, Somalia 2 years
5 Renovation of Kayseney Hospital 1992 International Committee of the Red Cross, Somalia 3 years
6 Rehabilitation of Adale Clinic 1993 ADRA, Somalia 6 Months
7 Drilling Boreholes in Middle Shabelle region 1993-99 USAID/ADRA, Somalia 7 years
8 Construction of Mogadishu -North Airstrip 1992 Somalia Community 6 Months
9 Construction of triage in in Keysaney hospital 1995 International Committee of the Red Cross, Somalia 6 Months
10 New roofing and maintenance of Keysaney hospital 1996 International Committee of the Red Cross, Somalia 6 Months
11 Drilling Boreholes in Galgadud region 1996-01 EU/ADRA, Somalia 6 Years
12 Construction of RCC access roads in Kaysaney hospital 2001 International Committee of the Red Cross, Somalia 6 Months
13 Construction of water facilities in Kaysaney hospital 2002 International Committee of the Red Cross, Somalia 1 year
14 River embankments Construction 1997 CEFA, Somalia 1 year
15 Excavation and construction of Mahaday canal 1995 Mahaday CARE, Somalia 6 Months
16 Excavation and construction of Kalundi canal 1996 ADRA, Somalia 6 Months
17 Excavation and construction of Buray canal 1996 CARE, Somalia 6 Months
18 Drilling Boreholes in Benadir region 1999-04 Somalia 6 years
19 Construction for the accommodation of 8 airstrips in Southern Somalia 2005 World Food Program, Somalia 1 year
20 Construction of 10 school feeding centres 2007 World Food Program, Somalia 1 year
21 Preparation of RCC jersey Barriers for defence and barricade purposes in and around Mogadishu 2010 United Nations Support Office in Somalia 1 year
22 Procurement of Pipes 2010 United Nations Support Office in Somalia, Mombasa 3 Months
23 Procurement of Construction Materials 2010 United Nations Support Office in Somalia 6 Months
24 UNSOA CON 10-30 Water Well Drilling in AMISOM Camps and UN Camps 2010 United Nations Support Office for AMISOM 1 year
25 Construction of Hesco defence Wall 2010 United Nations Support Office in Somalia 4 Months
26 Chain-link and razor wire installation 2011-2012 United Nations Support Office for AMISOM 1 year
27 UNSOA CON 12-006 Water Well Drilling, maintenance, and repair in all sectors in Somalia 2007 United Nations Support Office for AMISOM 1 year
28 UNSOA CON 12-038 Construction of Hesco Bastion Baskets defence walls and cell for security protection in and around the AMISOM camps and UN facilities 2012-2013 United Nations Support Office for AMISOM 1 year
29 UNSOA CON 13/012 Erection of UN supplied soft wall hangers 15 x 36m (works included Excavation of the ground levelling, watering and compaction. Setting out the form work and steel reinforcement, Concreting and final Erection of the warehouse 2013 United Nations Support Office for AMISOM 1 year
30 Rehabilitation of 3 police stations in Somalia Mogadishu Due to the Civil war in Somalia most of the buildings were destroyed and dilapidated. Deeqa Rehabilitated 3 Police stations in Mogadishu. This in turn improved the welfare of the police and improved on the security 2013 United Nations Support Office for AMISOM 1 year
31 Construction of concrete “V” channel for waste water management and Water Well Drilling at the British Embassy 2013 CBM/
British Embassy, MIA
6 Months
32 Construction of modern bakery at Inchcape shipping services with a capacity of producing 3000 sliced loaves of bread per day (ISS) 2013 Inchcape
Shipping Services, MIA
6 Months
33 Boundary Hesco installation with watch towers and bunker at the Aljazeera training ground (European Union) 2013 European Union Training Mission 3 Months
34 CCTV installation at Aden Adde International Airport and Nasa Hablod hotel (Enhancing security) 2013 Somali Civil Aviation Authority, MIA 1 Month
35 Construction of security bunker at Al-Jazeera for the
European Union(EU)
2014 European Union Training Mission 2 Months
36 Construction of perimeter block wall at Inchcape Shipping Services (ISS) 2013-2014 Inchcape
Shipping Services, MIA
6 Months
37 Storage yard modification by grading & compaction and construction of Waste water drainage system with silt traps at the Inchcape shipping Services (ISS) 2013-2014 Inchcape
Shipping Services, MIA
9 Months
38 UNSOA CON 14/23 Water wells construction and repairs and maintenance 2014 United Nations Support Office for AMISOM 4 Months
39 UNSOA CON 14/033 Construction of 9 accommodation facilities in Beletweyne 2014 United Nations Support Office for AMISOM 1 year
40 Construction of Security enhancement features at the immigration offices with T-walls boom gates, pedestrian gates and security check houses (Immigration Department Somalia) 2014 Immigration
Department Somalia, Mogadishu
4 Months
41 Roofing of accommodation containers and construction of a shelter (Supreme fuels) 2014 SUPREME FUELS, MIA 1 Month
42 Construction of security bunker for the Ministry of defense Somalia (Gashandigah) 2014 European Union Training Mission 1 Month
43 Supply of construction materials (Sand Gravel and Cement) (ISS) 2013-2014 Integrated Shipping Services, MIA 1 year
44 Construction works, force, protection works and supply of office furniture EU (European Union) 2014 European Union Training Mission 6 Months
45 Construction of Kenya Embassy Buildings 2015 Ministry Of Foreign Affairs-Kenya, MIA 1 year
46 Construction of hard wall buildings 2017 United Nations Support Office for AMISOM 5 years
47 Provision of Facility maintenance repair and ground maintenance services 2017 United Nations Support Office for Somalia 1 year
48 Provision of bore well repair and maintenance services 2017 United Nations Support Office for Somalia 1 year
49 Supply ,installation maintenance of water treatment system at the Demartino Hospital 2017-2018 United Nations Office for Project Services 1 year
50 Supply of two 175KvA Perkins generators with automatic change over system 2016 Dutch Embassy/Office, MIA Maintenance On going
51 Roofing of Buildings at the Dutch Office with Decra roofing tiles 2016 Dutch Embassy/Office, MIA 4 Months
52 Construction of prefab offices for UNDP,IOM and UNHCR in the MIA 2016 United Nations Development Programme, MIA 10 Months
53 Drilling of two bore wells and supply and installation of RO plant with 20,000 litres capacity per day 2016 Dutch Embassy/Office, MIA Maintenance On going
54 Collection, ,removal, ,recycling and disposal of used recyclable hazardous and non-hazardous products in Somalia 2018 United Nations Support Office for Somalia On going
55 Facility Maintenance Repair & Ground Maintenance Services 2017 United Nations Support Office for Somalia On going
56 Construction of Hard Walls Accommodation Facilities 2016 United Nations Support Office for Somalia On going
57 Provision of Cleaning, Laundry, General Repair & Maintenance Services 2019 International Organization for Migration, MIA On going
58 Upgrade of Serendi Centre 2019 Adam Smith International, MIA On going
59 Provision of Cleaning, Laundry and General Maintenance Services at IOM Compound in Mogadishu, Somalia 2019 International Development Law Organization, MIA On going
60 Refurbishment of Attorney General Office Library 2019 United Nations High Commissioner for Refugees, MIA On going
61 Water Work at UNHCR’s Representation Office in Mogadishu, Somalia 2019 UNHCR On going